Mannington Dura Max Tile Flooring Vinyl Installation Instructions
Always follow all safety guidelines when installing any flooring product to protect yourself and others.
Mannington dura max tile flooring vinyl installation instructions. Residual asphalt type adhesive must be completely removed and covered with underlayment plywood or high quality latex underlayment. Adura flex is a stable and reliable glue down floor that can be installed in long runs without transition strips ideal for homes with open floor plans. Adura max can stand up to the most active households and offers the industry s best wear scratch and stain resistance. Mannington s adura floor tile line is a vinyl tile made to resemble the look of real wood or stone.
Adura max installation information mannington strongly recommends using trained professional installers for the best long term performance of any of our flooring products. Anyone installing mannington products is urged to follow all directions and advice in the installation guidelines. Social buzz when we researched the different products that we could use for flooring we found that this mannington product stood up better than any other on the market. Existing floor coverings adura max can also be installed over most existing hard surface floor coverings provided that the existing floor surface can be made smooth.
View mannington s adura flex installation instructions. How to install mannington adura floor tiles. Never install adura homestead products over residual asphalt type cut back adhesive. Adura homestead are adhered with mannington mt 711.
Ceramic tile should be made smooth by applying a cementitious overlay such as patching or leveling. These resilient tiles are installed using adhesive. It can bleed through the new flooring.